We have performed hundreds of Federal, State, and Commercial projects throughout the Western United States, Hawaii, and American Samoa. Many of these projects included Historical Renovation, Design/Build, Energy Upgrade, Demolition, Asbestos Abatement, and Environmental Remediation work. Below are some of our "showcase"  projects.
ZNP SOUTH GATE PHOTO.JPG
Zion National Park Utah South Gate 
Renovation 

Zion National Park "South Gate Entrance Remove and Construct Fee Buildings". The Scope of Work includes Removing existing fee stations and providing temporary modular stations during the construction period and constructing four new fee stations with an overhead canopy. The sitework consists of new utilities, new concrete and asphalt lanes, landscaping and expanded incoming and outgoing traffic lanes. 

1200px-Diamond_Head_Lighthouse,_Honolulu
U.S.G.S. HAWAII Diamond Head  
Design Build Erosion and Fence Repairs

United States Coast Guard Shore Infrastructure Logistics Center in Hawaii. The work included replacement of the failing sections of the chainlink fence surrounding the perimeter of the property, repair of the existing rock wall, and erosion control work. Bill put together the submittals including writing an extensive fall protection plan, as the workers on this project would be working very close to a cliff area located at the Diamond Head Lighthouse.

thumbnail_IMG_20191107_111836419.jpg
BLM Grand Junction, Colorado Air Center Pavement Repair/Replace
Phase 1

Replacement and repair of the Retardant Apron Pavement at the Grand Junction Air Center for the BLM Fire Program. The work included the Full depth removal of areas of existing asphalt and concrete pavements, Over-excavation and haul off site of unsuitable subgrade soils, Import and placement of suitable subgrade soils, Reconstruction of concrete and asphalt pavement sections, Associated drainage, sediment controls and other incidental work items Mill and replace upper 3.5-inches of areas of existing asphalt pavement. Bill has managed many projects for the BLM throughout Colorado, putting together to cost estimates and writing the proposals along with managing the performance of the contracts.

US Air Force Academy
Asbestos Abatement Colorado Springs, Colorado
 

Direct award contract with the United States Air Force Academy in Colorado Springs, Colorado. The purpose of this project was to provide services to perform asbestos abatement in the Mitchell Hall ceiling plenum that meets the intent of CCR 8 and provide oversight of the Spill Response Cleanup as the Building Owner Representative. 

"Given what I know today about the contractor's ability to perform in accordance with this contract or order's most significant requirements, I would recommend them for similar requirements in the future." 

- Aaron Vollbracht Contracting Officer -

​

DOI Fish and Wildlife Services Design/Build Fabric Structure Hotchkiss, Colorado

Design/Build Fabric Structure contract for the Department of Interior Fish and Wildlife Services at the Fish Hatchery in Hotchkiss, Colorado. The first day on-site we began excavation for the continuous footings and foundation walls, as specified and designed; however, we ran into two main drainage 3' pipes running North/South on the inside of both the East and West foundation walls and through the foundation on the North and South walls. We issued a stop work request and demobilized that same day. We immediately went to work redesigning the footings and foundations on the North and South walls to include concrete columns instead of continuous concrete. We were able to complete this project on time and without requesting additions funds.

Hill Air Force Base 
Demolition IDIQ
Utah 

M Construction performed millions of dollars in contracts at Hill Air Force Base including numerous Demolition IDIQ contracts. Two examples of completed contracts are as follows: Demolition of Housing Area C - Relocate residents living in the 212 unit housing complex, reroute power, water, and gas lines from the demolition area to the area still occupied, demolition of 178 garage units, and safety and containment of the demolition site and operation of heavy equipment to systematic relocate residents; Building 1442 - Provide and install a complete intrusion detection system, remove and demolish the mechanical room including walls and roof, install entire new roof while protecting the existing structure both interior and exterior (the new roof structure was approximately 15,000 S.F.)

ls.jpg
General Services Administration (GSA)  
Colorado and Utah 

Renovation, asbestos abatement, and environmental protection projects in Colorado and Utah for the GSA including projects at the Denver Federal Center in Lakewood, Colorado (photo above). 

USDA Forest Service
  Colorado, Nevada, and Utah

USDA Forest Service installation of an electric vehicle charging stations (pictured above) at the Idaho Springs Ranger Station and another charging station at the Boulder Ranger Station, also Energy Upgrade, Toilet Replacement, Culvert Replacement, Demolition, Asbestos Abatement, and other similar types of projects for the Forest Service throughout Colorado.

Tooele Army Depot
Railroad Upgrade 
Tooele, Utah

"This letter of reference is for Bill Mounga an employee of M Construction in Orem, Utah. Mr. Mounga was the project manager for a railroad upgrade project at the Tooele Army Depot in Tooele, Utah. Mr. Mounga was tasked with coordinating work between the railroad subcontractor for their company and a railroad contractor for the Army. Each firm had specific work assigned and M Construction was faced with many time issues as the Army contractor appeared  to be working on a time and materials type contract. M Construction had to perform their part of the work after the Army Contractor had completed their part. As "time" was not a concern for the Army Contractor. Mr. Mounga did a very good job in coordination as their subcontractor was aggressive and worked to complete on schedule." 

- Marjorie C. Rosenquist Contracting Officer -

Veterans Administration
Mental Health Lockdown Wards
Palo Alto, California 
 

Veterans Administration in Palo Alto and Menlo Park, California. Including contracts to Tuck Pointing and Pressure Washing the exterior of Bldg. 101 (pictured above), renovation of the Mental Health Lock Down Wards in Palo Alto and Menlo Park, and replacement of Automatic Transfer Switches in Bldgs: 100, 101, and 102.

"These projects were extremely difficult in their execution and although they were not initially design/build contracts, Bill was instrumental and invaluable in assisting the VA in not only a design aspect, but also in performing extensive material research and coordinating with the using services."

- Susan Battjer VA Contracting Officer -

Dugway Proving Ground, Utah
IDIQ Contract

IDIQ contract at Dugway Proving Ground. This contract consisted of millions of dollars worth of contracts including the following: Demolition of 25 Duplex Units, sidewalks, driveways, interior roads, curbs, fences, and utility/sewer lines; Demolition of multiple buildings at Fries Park, and Runneau Court; Installation of three new chillers, new heating and cooling coils, and new Honeywell Alternate PLC automatic control system at MTF Building 8027; Demolition of buildings 5318 and 5710.   

NIST Fire Suppression/ Fire Alarm System
Ft. Collins, Colorado

Fire Suppression and Fire Alarm System project for the National Institute of Standards and Technology at their Ft. Collins Facility.  

"I commend the efforts of your Project Manager, Bill Mounga, on the outstanding job he did in coordinating and working with our staff at the facility in Ft. Collins..."

- Jack Schneider Contracting Officer's Representative NIST, Boulder -

Pueblo Chemical Depot Colorado Renovate Bldg 47 and Relocate Bldg Z224

Direct award contract at Pueblo Chemical Depot. The work included Replacing pole mounted transformers with a three phase pad mounted unit, replace above ground electrical lines with underground lines, remove 170 LF of abandon steam pipes covered with asbestos insulation, demolish wooden storage bins and replace with a lockable storage area for personal protective equipment, construct a room to house a gas mask fitting station, replace lighting fixtures, paint walls, remove electrical buss bar and install electrical service to the shop area, install a room to house IT wiring and equipment, construct and install storage shelves and lockers, install storage cabinets and work tables, replace and paint siding, replace copper wire pipes, replace toilets and sinks, install two waterless urinals,replace two electric water heaters with on demand gas water heaters, construct concrete sidewalk, seal the windows, relace the blinds, install privacy screening, install roll flooring, replace HVAC, etc..

"This letter is written to provide feedback regarding the level of excellence demonstrated..."

- Paul J. Ryall General Engineer DPW, Pueblo Chemical Depot -

FE Warren AFB Historical Renovation
Cheyenne, Wyoming

Historical renovation project at FE Warren AFB in Cheyenne, Wyoming. This was a direct award SBA 8(a) contract. We were able to preserve most of the original hardwood floors after removing all of the asbestos floor tile and black mastic and preserve the original floor, wall, and window trim - each piece was carefully removed and taken offsite for lead paint removal and reinstalled in it's original location. 

Hill Air Force Base, Utah Design/Build West Gate Landmark F-16

The F-16 West Gate Landmark is a high profile Design/Build project M-Construction performed at Hill Air Force Base in Ogden, Utah.

"Those driving by the West Gate can now see the display honoring aircraft no. 90402, which served as an F-16 flight test vehicle for many years."

Ft. Collins LDS Temple Concrete Work, 
Colorado

Site concrete work at the Ft. Collins LDS Temple, including the installation of approximately 1,600 cubic yards of concrete. This work included the installation of concrete foundation and planter walls with intricate radiuses, which had to be installed to match dozens of precast concrete walls. The scope of work also included imbedding hundreds of steel welding plates in the concrete footings and foundation walls to enable the precast concrete to be placed and installed. These plates had to be precisely placed and leveled in order to match the welding plates which were already installed on each precast concrete wall. The work also included the installation of colored decorative concrete, sidewalks, radiant heat stairways and fountain areas, vehicle drives, mow curb, fence curb, signs, and other intricate and decorative concrete work throughout the project site. 

​

​

​

​

​

​

Blue Sky Communications Network Operation Center,
American Samoa

Network Operation Center (pictured above) in Illiili, included the installation of a 10' X 10' X 10' cube concrete foundation for their satellite dish, Laufou Shopping Center Offices and Store, and Fagatogo Store in American Samoa for Blue Sky Communications. 

"Bill did a job that very few people could have done, on both buildings."

- Li'amatua Tufele, Jr. Director of Engineering -

Utah National Guard 

M Construction completed the following projects for the Utah National Guard: Painting Jet Fuel Tanks, constructing a pitch metal roof system in place of a flat roof, Bldg. 7 renovation and upgrades, installation of 55 ton gas-fired engine-driven chillers at Bldg 40 and Bldg 50. 